home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / JPLNEWS1 / 0449.PR < prev    next >
Text File  |  1993-04-21  |  2KB  |  33 lines

  1. OFFICE OF PUBLIC INFORMATION 
  2. JET PROPULSION LABORATORY, CALIFORNIA INSTITUTE OF TECHNOLOGY 
  3. NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 
  4. PASADENA, CALIFORNIA.  TELEPHONE 354-5011 
  5.  
  6. Memo to Editors: 
  7.          The fourth of a series of Surveyor spacecraft, designed 
  8. to soft land on the moon, will be launched from Cape Kennedy  
  9. during a launch period beginning Thursday, July 13, and ending  
  10. Monday, July 17. 
  11.          The press room will be open at JPL at 3 a.m. PDT Thurs- 
  12. day.  The launch window for the first day opens at 4 a.m. PDT. 
  13.          Commentary on the mission will be provided during major 
  14. events.  The flight time to the moon will be about 65 hours.  If 
  15. Surveyor succeeds in the soft landing and returns lunar photo-  
  16. graphs to earth, picture release will be at JPL. 
  17.          This Surveyor will again be equipped with a device to  
  18. dig into the lunar soil.  The payload on this flight will also  
  19. include, for the first time, a magnetic test device which will  
  20. utilize a small magnet to determine if the lunar soil contains  
  21. magnetic material. 
  22.          The following public information people will be avail-  
  23. able during the mission. 
  24.                     __________   ________________   ____________ 
  25. Frank Colella       790-1652     354-6400           354-5011 
  26. Frank Bristow       790-5140     354-6400           354-5011 
  27. Bob Mac Millin      790-7849     354-6400           354-5011 
  28. Alan Wood           355-1814     354-6400           354-5011 
  29.                                  _______________________________ 
  30.                                   Frank J. Colella 
  31.  
  32. 449-7/11/67 f 
  33.